Metro and Bath Iron Works will be ending our pilot to extend select BREEZ trips to Bath Iron Works (BIW) after the end of service on Friday, October 2nd.

The northbound trips beginning at 5:06am and 1:55pm from Thompson’s Point and ending at BIW, as well as the southbound trip departing BIW at 3:40pm, will no longer operate after October 2. Additionally, the southbound trip departing BIW at 6:20am will no longer depart from BIW, and will instead begin at Brunswick Train Station at 6:45am. All other trips are remaining unchanged.